{"id":20601,"date":"2026-07-20T09:40:19","date_gmt":"2026-07-20T13:40:19","guid":{"rendered":"https:\/\/www.pmpstrategy.com\/?p=20601"},"modified":"2026-07-23T11:17:13","modified_gmt":"2026-07-23T15:17:13","slug":"behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites","status":"publish","type":"post","link":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/","title":{"rendered":"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites"},"content":{"rendered":"\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>The electricity&nbsp;system&nbsp;is under&nbsp;pressure<\/strong>&nbsp;<\/h2>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\"><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Something structural is shifting in European electricity markets, and it is happening faster than most expected.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Two forces are driving this. On the supply side, solar and wind now account for a growing share of the generation mix \u2014 and unlike nuclear or gas, they cannot be dispatched on demand. The predictable baseload floor that nuclear once provided is quietly eroding, squeezed by ageing plants and a political climate that has, in many countries, made large-scale nuclear expansion a slow or contested process.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"718\" height=\"305\" src=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-160945.png\" alt=\"\" class=\"wp-image-20592\" srcset=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-160945.png 718w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-160945-300x127.png 300w\" sizes=\"auto, (max-width: 718px) 100vw, 718px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"754\" height=\"496\" src=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161054.png\" alt=\"\" class=\"wp-image-20589\" srcset=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161054.png 754w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161054-300x197.png 300w\" sizes=\"auto, (max-width: 754px) 100vw, 754px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">On the demand side, electrification is picking up pace. Electric vehicles, heat pumps, and industrial process upgrades are all introducing sharper, less predictable load profiles. And as C&amp;I consumers move away from fixed-price contracts towards spot-indexed or \u201cblock + spot\u201d supply arrangements \u2014 often guided by energy brokers \u2014 their exposure to price volatility is rising accordingly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The combined effect is a wholesale price structure that looks nothing like it did a decade ago. Midday prices regularly collapse under the weight of solar generation, while evening peaks \u2014 still set by gas-fired plants covering residual demand \u2014 remain elevated. The \u201cduck curve,\u201d once a Californian curiosity, is now a feature of several European markets. In Europe, the number of hours with negative spot prices has increased seventeen-fold over five years. Recent geopolitical events, including the conflict in Iran, have pushed peak prices higher still, widening spreads further.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a battery, that spread is the opportunity.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>1. \u201cBehind-the-Meter\u201d BESS: Value on Both Sides of the Meter<\/strong><\/h2>\n\n\n\n<ol start=\"2\" class=\"wp-block-list\"><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The first generation of large-scale battery projects \u2014 utility-scale, front-of-the-meter \u2014 ran into a problem that has become all too familiar: grid connection queues stretching years into the future. In many European countries, a project awarded today may not be connected until the late 2020s. That delay erodes returns significantly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The behind-the-meter (BTM) model sidesteps this entirely. By installing the battery directly on a customer\u2019s site and routing it through the site\u2019s existing grid connection, there is no new connection to apply for. The infrastructure is already there. Development timelines shrink, and the economics improve accordingly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What makes the BTM model distinctive, though, is not just the avoided connection cost. It is the revenue structure. A BTM battery is a dual-revenue asset:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>It reduces the customer\u2019s electricity bill directly \u2014 through PV self-consumption optimization, off-peak\/peak tariff arbitrage, and peak-shaving to bring down contracted power capacity.<\/li>\n\n\n\n<li>It also participates in wholesale and ancillary services markets \u2014 secondary reserve, capacity mechanisms, SRAD in Spain, intraday arbitrage via NEBCO in France \u2014 generating revenues that are entirely independent of what the customer pays for their electricity.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Stacking these two income streams is what sets the BTM business case apart from its FTM counterpart. Neither stream alone is remarkable; together, they make the model genuinely resilient. stacking,&#8221; which is one of the distinctive characteristics of the BTM model.\u00a0<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. BESS as Infrastructure, Not Just an Add-On<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">There is a tendency to treat battery storage as an optimization layer \u2014 something you bolt on at the end of a project to squeeze out a bit more value. That framing is increasingly outdated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As C&amp;I and industrial sites electrify their operations \u2014 adding EV charging infrastructure, heat pumps, and electrified thermal processes alongside existing PV installations \u2014 the complexity of managing on-site energy grows rapidly. Multiple assets, each with its own demand curve and operating logic, need to be coordinated. Without storage, the result is power peaks that breach contracted capacity limits, curtailed solar output, and a consumption profile that is expensive and hard to manage.\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"761\" height=\"526\" src=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161134.png\" alt=\"\" class=\"wp-image-20586\" srcset=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161134.png 761w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161134-300x207.png 300w\" sizes=\"auto, (max-width: 761px) 100vw, 761px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A BTM battery, paired with an Energy Management System (EMS) and intelligent dispatch algorithms, provides the coordination layer that makes the rest of the system work. It absorbs PV surpluses, smooths the spikes from charging stations and heat pumps, and keeps the overall site profile within its power subscription. Without it, these multi-asset electrification projects either underperform or require a costly increase in contracted grid capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is why the battery is increasingly specified at the design stage of electrification programs, not retrofitted afterwards. For industrial players and commercial property managers running serious decarbonization programs, <strong>the battery is what makes the overall project technically and economically coherent.<\/strong>\u00a0<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>3. The Window Is Open \u2014 and the Long-Term Case Is Solid<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The BTM storage market in Europe is still young. That immaturity is, right now, a feature rather than a bug.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Demand for flexibility is high \u2014 the electricity system needs it, and the structural drivers are only intensifying. But the pool of BTM flexibility assets is still small. The result is unusually strong pricing. In France, the average intraday spread stood at around \u20ac90\/MWh in 2025, compared to \u20ac22\/MWh in 2019. Ancillary services revenue, particularly secondary reserve, remains well-supported.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This will not last indefinitely. As more BTM assets come online, spreads will compress and ancillary service payments will normalize. That compression is already being modeled into long-term business cases. But a partial normalization of near-term revenue levels does not break the underlying investment thesis \u2014 it simply recalibrates it.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"568\" height=\"319\" src=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161203.png\" alt=\"\" class=\"wp-image-20583\" srcset=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161203.png 568w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161203-300x168.png 300w\" sizes=\"auto, (max-width: 568px) 100vw, 568px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The long-term case rests on fundamentals that do not depend on the current pricing cycle:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Dispatchable capacity is being retired faster than it is being replaced, keeping structural price spreads elevated<\/li>\n\n\n\n<li>The more intermittent the generation mix becomes, the more the system needs fast, flexible response \u2014 and that demand will not diminish<\/li>\n\n\n\n<li>Regulatory reform is moving, slowly but directionally, towards better recognition and remuneration of BTM flexibility (TURPE 7 in France, evolving capacity mechanisms in Spain and elsewhere)<\/li>\n\n\n\n<li>As electrification of end uses deepens, on-site consumption profiles become more volatile, making storage more valuable, not less<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The short-term opportunity is real. So is the long-term one.\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"912\" height=\"462\" src=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161310.png\" alt=\"\" class=\"wp-image-20577\" srcset=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161310.png 912w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161310-300x152.png 300w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161310-768x389.png 768w\" sizes=\"auto, (max-width: 912px) 100vw, 912px\" \/><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4. A Three-Player Ecosystem \u2014 and Why It Matters<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Deploying a BTM BESS asset on a C&amp;I or industrial site is not a single-player activity. It works best when three types of players each bring what they do well.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>end customer<\/strong> \u2014 the site owner or operator \u2014 provides the physical anchor: the load profile, the operational constraints, and ultimately the willingness to host the asset. Their consumption behavior shapes the entire dispatch strategy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Aggregators<\/strong> are the market access layer. Through real-time control platforms, they continuously manage the battery\u2019s allocation across different revenue streams \u2014 arbitrating between spot signals, reserve commitments, and the immediate needs of the site. Without them, the market revenues simply are not reachable for a single BTM asset.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>ESCOs and third-party investors<\/strong> bring the customer relationships and the financing. Many of them have spent years building portfolios through PV self-consumption and energy efficiency contracts. Those same customers are now candidates for a BTM battery offer. Their site knowledge, ability to structure off-balance-sheet financing, and long-term operational presence make them well-positioned to deploy these assets at scale.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"530\" height=\"153\" src=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161235.png\" alt=\"\" class=\"wp-image-20580\" style=\"aspect-ratio:3.46440608722296;width:638px;height:auto\" srcset=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161235.png 530w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/Capture-decran-2026-07-15-161235-300x87.png 300w\" sizes=\"auto, (max-width: 530px) 100vw, 530px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">What creates value here is not any one of these players acting alone. It is the way they fit together \u2014 each covering a capability the others lack. Projects that get this coordination right are the ones that make the economics work over a 20-year asset life.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">5. Summary<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The behind-the-meter battery has quietly moved from niche product to essential infrastructure. It addresses a genuine and growing need of the electricity system, delivers measurable cost savings to C&amp;I sites, and generates market revenues that are structurally supported for the long term.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The current environment \u2014 wide spreads, strong ancillary services revenue, limited BTM competition \u2014 makes this an unusually favorable moment for early movers. That window will not stay this wide forever. But even as the market matures and revenue levels normalize, the structural case for BTM storage remains intact, built on fundamentals that electrification and grid transformation will only reinforce.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How PMP Strategy can help<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PMP Strategy can model the full revenue stack available to a behind-the-meter battery \u2014 across intraday markets, ancillary services, and on-site savings \u2014 providing investors, ESCOs, and industrial players with a rigorous basis for their business case.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"has-text-align-right wp-block-paragraph\">Article by PMP Strategy: Laura Papet-Arnal, Associate Partner, Philippe Angoustures, Partner, Ronan Pilard, Manager<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"303\" src=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/2024\/01\/logo-PMP-Strategy-violet-1024x303.jpg\" alt=\"\" class=\"wp-image-9899\" style=\"aspect-ratio:3.3796441818067517;width:208px;height:auto\" srcset=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/2024\/01\/logo-PMP-Strategy-violet-1024x303.jpg 1024w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/2024\/01\/logo-PMP-Strategy-violet-300x89.jpg 300w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/2024\/01\/logo-PMP-Strategy-violet-768x227.jpg 768w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/2024\/01\/logo-PMP-Strategy-violet-1536x454.jpg 1536w, https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/2024\/01\/logo-PMP-Strategy-violet-2048x605.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About PMP Strategy<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PMP Strategy is an independent International strategic management consulting firm distinguished by Partners who bring C-level operational experience and combine deep sector&nbsp;expertise&nbsp;with strategic rigor to deliver tangible, lasting impact.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For over twenty years, we have served as trusted advisors to executive committees and investors across&nbsp;North America,&nbsp;Europe,&nbsp;the Middle East, and&nbsp;Africa. We specialize in five key sectors where transformation is most critical: Telecoms, Media &amp; Technology (TMT), Private Equity, Financial Institutions, Transport &amp; Mobility, and Industry &amp; Energy. Our Transversal Performance practice leads complex, cross-sector transformation programs, while our Innovation Lab\u2014a dedicated team of AI experts\u2014supports client engagements worldwide from our headquarters in Paris and our network of international offices.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u202fOur approach is built on partnership\u2014designing tailored strategies alongside clients and working hand in hand to drive implementation, delivering measurable results that evolve with their ambitions.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Learn more at&nbsp;<a href=\"http:\/\/www.pmpstrategy.com\/en\/\">www.pmpstrategy.com<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Press contact:<br>Jennifer Campbell<br>+33 6 32 05 14 27<br><a href=\"mailto:jcampbell@pmpstrategy.com\">jcampbell@pmpstrategy.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The electricity&nbsp;system&nbsp;is under&nbsp;pressure&nbsp; Something structural is shifting in European electricity markets, and it is happening faster than most expected. Two forces are driving this. On the supply side, solar and&#8230;<\/p>\n","protected":false},"author":6,"featured_media":20598,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"cybocfi_hide_featured_image":"yes","footnotes":""},"categories":[103,114,101,115,74,99,118,78],"tags":[],"class_list":["post-20601","post","type-post","status-publish","format-standard","has-post-thumbnail","category-a-la-une-en","category-a-la-une-en-3","category-actu-en","category-actu-en-2","category-en","category-energy-industries-decarbonization","category-fr-en","category-publications-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites - PMP Strategy<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites - PMP Strategy\" \/>\n<meta property=\"og:description\" content=\"The electricity&nbsp;system&nbsp;is under&nbsp;pressure&nbsp; Something structural is shifting in European electricity markets, and it is happening faster than most expected. Two forces are driving this. On the supply side, solar and...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/\" \/>\n<meta property=\"og:site_name\" content=\"PMP Strategy\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PMPStrategy\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-20T13:40:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-23T15:17:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/iStock-1467445163.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2071\" \/>\n\t<meta property=\"og:image:height\" content=\"1447\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ksenija Boskovic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PMP_Strategy\" \/>\n<meta name=\"twitter:site\" content=\"@PMP_Strategy\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ksenija Boskovic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/\"},\"author\":{\"name\":\"Ksenija Boskovic\",\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#\\\/schema\\\/person\\\/f5355da1b61be74ffe6b4c4d302367c0\"},\"headline\":\"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites\",\"datePublished\":\"2026-07-20T13:40:19+00:00\",\"dateModified\":\"2026-07-23T15:17:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/\"},\"wordCount\":1505,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pmpstrategy.com\\\/wp-content\\\/uploads\\\/iStock-1467445163.jpg\",\"articleSection\":[\"a la une\",\"\u00c0 la une\",\"Actu\",\"actualit\u00e9\",\"EN\",\"Energy &amp; Industries Decarbonization\",\"FR\",\"Publications\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/\",\"url\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/\",\"name\":\"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites - PMP Strategy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pmpstrategy.com\\\/wp-content\\\/uploads\\\/iStock-1467445163.jpg\",\"datePublished\":\"2026-07-20T13:40:19+00:00\",\"dateModified\":\"2026-07-23T15:17:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/2026\\\/07\\\/20\\\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/\",\"name\":\"PMP Strategy\",\"description\":\"\u00c9lever vos attentes en conseil en strat\u00e9gie\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#organization\",\"name\":\"PMP Strat\u00e9gie\",\"url\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pmpstrategy.com\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/meta-image-square.jpg\",\"contentUrl\":\"https:\\\/\\\/pmpstrategy.com\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/meta-image-square.jpg\",\"width\":696,\"height\":696,\"caption\":\"PMP Strat\u00e9gie\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PMPStrategy\",\"https:\\\/\\\/x.com\\\/PMP_Strategy\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/#\\\/schema\\\/person\\\/f5355da1b61be74ffe6b4c4d302367c0\",\"name\":\"Ksenija Boskovic\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0d4bb1c1f8668b6796860b9dfde4a1acb6ca13b209e716ff44935d69367c345a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0d4bb1c1f8668b6796860b9dfde4a1acb6ca13b209e716ff44935d69367c345a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0d4bb1c1f8668b6796860b9dfde4a1acb6ca13b209e716ff44935d69367c345a?s=96&d=mm&r=g\",\"caption\":\"Ksenija Boskovic\"},\"url\":\"https:\\\/\\\/www.pmpstrategy.com\\\/en\\\/author\\\/ksenija\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites - PMP Strategy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/","og_locale":"en_US","og_type":"article","og_title":"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites - PMP Strategy","og_description":"The electricity&nbsp;system&nbsp;is under&nbsp;pressure&nbsp; Something structural is shifting in European electricity markets, and it is happening faster than most expected. Two forces are driving this. On the supply side, solar and...","og_url":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/","og_site_name":"PMP Strategy","article_publisher":"https:\/\/www.facebook.com\/PMPStrategy","article_published_time":"2026-07-20T13:40:19+00:00","article_modified_time":"2026-07-23T15:17:13+00:00","og_image":[{"width":2071,"height":1447,"url":"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/iStock-1467445163.jpg","type":"image\/jpeg"}],"author":"Ksenija Boskovic","twitter_card":"summary_large_image","twitter_creator":"@PMP_Strategy","twitter_site":"@PMP_Strategy","twitter_misc":{"Written by":"Ksenija Boskovic","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/#article","isPartOf":{"@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/"},"author":{"name":"Ksenija Boskovic","@id":"https:\/\/www.pmpstrategy.com\/en\/#\/schema\/person\/f5355da1b61be74ffe6b4c4d302367c0"},"headline":"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites","datePublished":"2026-07-20T13:40:19+00:00","dateModified":"2026-07-23T15:17:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/"},"wordCount":1505,"publisher":{"@id":"https:\/\/www.pmpstrategy.com\/en\/#organization"},"image":{"@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/iStock-1467445163.jpg","articleSection":["a la une","\u00c0 la une","Actu","actualit\u00e9","EN","Energy &amp; Industries Decarbonization","FR","Publications"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/","url":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/","name":"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites - PMP Strategy","isPartOf":{"@id":"https:\/\/www.pmpstrategy.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/#primaryimage"},"image":{"@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/iStock-1467445163.jpg","datePublished":"2026-07-20T13:40:19+00:00","dateModified":"2026-07-23T15:17:13+00:00","breadcrumb":{"@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pmpstrategy.com\/en\/2026\/07\/20\/behind-the-meter-battery-a-key-flexibility-asset-and-an-opportunity-for-the-electrification-of-industrial-and-commercial-sites\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pmpstrategy.com\/en\/"},{"@type":"ListItem","position":2,"name":"\u201cBehind-the-Meter\u201d Battery: A Key Flexibility Asset and an Opportunity for the Electrification of C&amp;I Sites"}]},{"@type":"WebSite","@id":"https:\/\/www.pmpstrategy.com\/en\/#website","url":"https:\/\/www.pmpstrategy.com\/en\/","name":"PMP Strategy","description":"\u00c9lever vos attentes en conseil en strat\u00e9gie","publisher":{"@id":"https:\/\/www.pmpstrategy.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pmpstrategy.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pmpstrategy.com\/en\/#organization","name":"PMP Strat\u00e9gie","url":"https:\/\/www.pmpstrategy.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pmpstrategy.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pmpstrategy.com\/wp-content\/uploads\/2023\/12\/meta-image-square.jpg","contentUrl":"https:\/\/pmpstrategy.com\/wp-content\/uploads\/2023\/12\/meta-image-square.jpg","width":696,"height":696,"caption":"PMP Strat\u00e9gie"},"image":{"@id":"https:\/\/www.pmpstrategy.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PMPStrategy","https:\/\/x.com\/PMP_Strategy"]},{"@type":"Person","@id":"https:\/\/www.pmpstrategy.com\/en\/#\/schema\/person\/f5355da1b61be74ffe6b4c4d302367c0","name":"Ksenija Boskovic","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0d4bb1c1f8668b6796860b9dfde4a1acb6ca13b209e716ff44935d69367c345a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0d4bb1c1f8668b6796860b9dfde4a1acb6ca13b209e716ff44935d69367c345a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0d4bb1c1f8668b6796860b9dfde4a1acb6ca13b209e716ff44935d69367c345a?s=96&d=mm&r=g","caption":"Ksenija Boskovic"},"url":"https:\/\/www.pmpstrategy.com\/en\/author\/ksenija\/"}]}},"featured_image_src":"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/iStock-1467445163-600x400.jpg","featured_image_src_square":"https:\/\/www.pmpstrategy.com\/wp-content\/uploads\/iStock-1467445163-600x600.jpg","author_info":{"display_name":"Ksenija Boskovic","author_link":"https:\/\/www.pmpstrategy.com\/en\/author\/ksenija\/"},"_links":{"self":[{"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/posts\/20601","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/comments?post=20601"}],"version-history":[{"count":6,"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/posts\/20601\/revisions"}],"predecessor-version":[{"id":20613,"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/posts\/20601\/revisions\/20613"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/media\/20598"}],"wp:attachment":[{"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/media?parent=20601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/categories?post=20601"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pmpstrategy.com\/en\/wp-json\/wp\/v2\/tags?post=20601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}